Phase Two

PHASE 2:   May 2010 – Dec 2010

a. Camping Area 1 – Break ground for Camping Area 1. The area chosen is gently sloped for drainage, readily accessible to the front entrance, and close to nsaka#1.  A large stand of trees serves as a barrier between roadway and campers. COMPLETE

b. Chalets- Construct 5 chalets that will accommodate 10-12 campers in bunk beds.   Estimated cost: $ 3,600/chalet   ($18,000 total) COMPLETE

c. Kitchen Structure – Erect a “Tonga kitchen” near the center of Camping Area 1. Tonga kitchens are usually semi-open cooking structures where fires are easily accommodated.    Estimated cost: $2,000 COMPLETE

d.   Plumbing -  Significantly expand current water distribution system.  Install 3 large storage tanks and piping to campground #1.  Install diesel generator for well and distribution during power outages.  Run water and plumbing to  Phiri house and (future) Huckaby houses.  Estimated cost: $12,500 COMPLETE

e.   Playground-  Relocate play structure from the home of one AZ missionary family and set up play area near Campground #1. Estimated cost: $ 2,500 ON HOLD PENDING FUNDING

f.    Mattresses & Showers – Mattresses for bunks and four showers are needed for campers.  A simple structure will be erected near the existing pit latrines for this purpose.  Estimated cost:  $2,500 ON HOLD PENDING FUNDING

TOTAL ESTIMATED COST FOR PHASE 2:    $ 37,500

FUNDED TO DATE:                                $ 20,000

REMAINING FOR PHASE 2:               $ 17,500

b. Chalets- Construct 5 chalets that will accommodate 10-12 campers in bunk beds.   Estimated cost: $ 3,600/chalet   ($18,000 total)

c. Tonga Kitchen – Erect a “Tonga kitchen” near the center of Camping Area 1. Tonga kitchens are usually semi-open cooking structures where fires are easily accommodated.    Estimated cost: $2,000

d.   Plumbing -  Significantly expand current water distribution system.  Install 3 large storage tanks and piping to campground #1.  Install diesel generator for well and distribution during power outages.  Run water and plumbing to  Phiri house and (future) Huckaby houses.  Estimated cost: $12,500

e.   Playground-  Relocate play structure from the home of one AZ missionary family and set up play area near Campground #1. Estimated cost: $ 2,500

f.    Mattresses & Showers – Mattresses for bunks and four showers are needed for campers.  A simple structure will be erected near the existing pit latrines for this purpose.  Estimated cost:  $2,500

TOTAL ESTIMATED COST FOR PHASE 2:    $ 37,500

FUNDED TO DATE:                                $ 20,000